asdalksdjaksdjalksdasdjlaksjdkalsdjlkas lkasdas lkasdjalksd laksdjalksdjaksd
asdalksdjaksdjalksdasdjlaksjdkalsdjlkas lkasdas lkasdjalksd laksdjalksdjaksd
15 Mannicotts, WGC, Herts, AL8 7BW
info@rcpcontractorsltd.co.uk
01707 912324
© 2024 RCP Contractors Ltd. All Rights Reserved. Designed by Complete Business LTD
Streamlined 3-Stage Approach
Start by appointing an architect to create the plans for your project. Once you’ve agreed on the designs, these plans will be submitted to the local planning authority for approval.
Inclusions: Be sure to include any major changes to gardens and driveways in your submission as well.
Once planning permission is granted, the project parameters are set. Your architect will refine the drawings to include construction details like drainage layouts, insulation, ventilation, and critical measurements.
Submission for Approval: The marked-up drawings, along with the engineer’s details and calculations, will be submitted to the local authority building control or a private authority for approval. Building control acts as the structural warrantor for your project.
Some architects may offer a separate document for this stage at an additional cost, but clients can also compile it themselves. This document outlines your specific needs and preferences, including:
Once these three stages are complete, we’ll have all the relevant information needed to provide an accurate and realistic price for your project, ensuring you achieve your desired outcome.